The load-bearing beam is in place and needs to be permanently supported with a couple of trimmer studs on each sides. Toe-nailing everything securely and the beam job is done. The nail-gun is a fun toy and it's hard to not nail everything more than needed.
Moment of truth: Removing the temporary wall to see if the floor above stays flat. Tada!
|
What is the fridge still doing here? |
|
Trimmer studs |
No comments:
Post a Comment